Installation pattern

The UV-Ionizer is built into the filter cycle of the swimming pool, a dry technique area would be best.

The water entrance of the UV-ionizer is in the upper right hand corner and connected with the piping, which comes from the pressure site of the filter.

The exit at the bottom left hand corner is connected with the line, which leads back to the pool.

External pH-dosage-systems, heat exchangers or other technical equipments should be installed after the UV-Ionizer.

Put in the plug and the system is ready to run.

Function sequence